DAO Project Proposal Feature - #114

Open
jairajdev wants to merge 27 commits into
devfrom
feat/dao-project-proposals
Open

DAO Project Proposal Feature#114
jairajdev wants to merge 27 commits into
devfrom
feat/dao-project-proposals

Conversation

@jairajdev

Copy link
Copy Markdown
Contributor

No description provided.

First commit of DAO Phase 2. Types and data only — no handlers, and no proposal
can reach a project status yet, so behaviour is unchanged.

- Add 'project' to DaoProposalType and 'executing'/'completed'/'terminated' to
  DaoProposalStatus. The first three are parameter-proposal states; the last
  three are project-only.
- Add DaoMilestone, DaoProjectData, DaoTerminateVote and DaoProjectLogEntry.
  Endorsements are a flat address array with the proposer at index 0, matching
  the policy shape; proposedTime/endorsedTime are shared by milestone start and
  end and must be cleared on each commit.
- Hang project data off DaoProposalAccount rather than a new account type, and
  leave it lazily created like unapplyVotes, so non-project proposals carry no
  empty object.
- Widen the dao_claim_reward and dao_burn_reward status allowlists to include
  the project statuses. Not cosmetic: a project leaves 'accepted' at
  dao_project_start and never returns, so without this its voter reward pool
  would be permanently unclaimable and unburnable. The allowlists are
  hand-maintained string comparisons that widening the union does not flag.

dao_proposal_create still rejects 'project' at runtime; accepting it is the next
commit.
Project proposals can now be created, reviewed and voted on. They cannot yet be
executed — dao_project_start and the milestone transactions come next.

- Route payload validation by type. Projects carry milestones, not parameter
  changes, so they never reach validateProposalChangeSets, which would reject
  them for having no change sets at all.
- Add validateProjectMilestones with creation-time bounds: milestone count,
  title and text lengths, a positive finite duration, and parseable
  non-negative USD strings. The proposer picks the size of an account that every
  later project transaction rewrites and re-hashes, so this is what stops one
  proposal making all of its own transactions expensive.
- Reject emergency project proposals. Projects mint new coins, so they must
  always face a community vote rather than the committee-only path.
- Require exactly two ballot options for projects. A project has one flat
  milestone array with no per-option variant, so a third option would select
  nothing.
- Snapshot the bonus and penalty percentages onto the project at creation, so a
  project is judged by the rules it was created under.

validateProjectMilestones deliberately does not validate the contractor address:
importing the utils barrel from a fresh util pulls in the existing config/utils
import cycle and leaves libToWei undefined at config evaluation time. The
address is a sibling field, so the caller checks it.
Standalone commit: this is the only guard on the one DAO operation that creates
LIB, so it gets reviewed on its own before dao_project_start consumes it.

- Add daoMaxMintThresholdLibStr to LiberdusFlags as a decimal LIB string, so it
  stays JSON-safe over /debug-liberdus-flags and parses to exact wei with no
  float rounding.
- maxMintThresholdWei() throws on a malformed or negative value instead of
  falling back to a default. A ceiling that silently becomes something other
  than what an operator configured is worse than a failed transaction; the throw
  lands inside transaction validation, so a bad value stops mints rather than
  widening them.
- exceedsMintThreshold() is strictly greater, so a mint exactly at the ceiling is
  allowed. Zero is a valid value and blocks every mint — a deliberate kill
  switch, distinct from a malformed one.

Two limits are deliberate and both are commented at the flag. This is a
per-project cap, not a supply cap: without current_supply, N projects can each
pass it and still mint arbitrarily much in aggregate. And the default value is a
placeholder that must be set from tokenomics before this reaches a real network.
The mint. An accepted project proposal moves to executing, its balance is minted,
and the USD/LIB rate is fixed for every later payout. This is the only DAO
transaction that creates LIB, so it is its own commit.

- Committee-only, and the grace period always applies. Projects can never be
  emergency proposals, so unlike dao_apply_parameters there is no path that
  skips the wait.
- Mint is sum(cost + bonus) across milestones, deliberately excluding penalties:
  a penalty only reduces what a contractor is paid, so folding it in would
  inflate the escrow and mint more than the project can legitimately pay out.
- The amount is recomputed in apply() rather than carried over from validate(),
  so apply() depends only on wrappedStates, which Shardus snapshots identically
  for every node.
- A malformed milestone amount and a malformed mint ceiling both fail the
  transaction. Never mint on a total that could not be computed.
- rateUsdStr is snapshotted from the network's stability factor. Every later
  payout converts at this rate, so the contractor carries the LIB price risk
  from here and the DAO's exposure is fixed at the amount minted.
- Start the project log, which every subsequent project transaction appends to.

appendProjectLog lives in its own util so the eight project transactions share
one implementation. It is uncapped, with the reasoning and a TODO at the
function: the log grows with committee behaviour, not milestone count, since
re-proposing a time or address is unlimited and each attempt appends.
dao_project_milestone_start, _end and _terminate, plus the endorsement machinery
the three of them share.

- applyEndorsement implements D7: the proposer always counts as the first
  endorsement, so three total means three agreeing parties, never four. Read the
  policy's "endorsed by two committee members", "two more committee members" and
  "once three committee members submit" with the proposer counted and all three
  already say three.
- The threshold clamps to what is reachable, and the reachable maximum differs by
  path. On start and end the contractor occupies index 0 and the committee
  supplies the rest, so the ceiling is committeeSize + 1; clamping those to
  committeeSize would commit a milestone one endorsement early on a small
  committee.
- The contractor may propose but not endorse. Otherwise they could hold two of
  the three slots, and re-proposing would let them reset the count every time the
  committee got close to agreeing.
- Re-proposing clears the endorsement list and re-seeds it with the new proposer,
  and committing clears both fields, so endorsements collected for a start cannot
  carry into the end. The two questions share the same storage.
- Milestones run strictly in order. canStartMilestone checks every earlier
  milestone rather than only the previous one, which costs nothing and closes the
  case where an earlier one was left pending.
- Milestone numbers are 1-based in transactions and 0-based in storage, with both
  boundaries rejected explicitly: an off-by-one here misroutes a payment.
- Terminating releases the milestone's cost and bonus back out of the project
  balance, mirroring what was minted for it, and requires a reason on every
  submission — the log is what a dispute would be argued from.

validate() dry-runs the endorsement against a copy of the list so it reports the
same rejection apply() would, without mutating consensus state.
The payout. A completed milestone pays the contractor from the project balance,
adjusted for how early or late it was delivered.

- classifyDelivery compares actual against planned duration using the project's
  own percentages. Both comparisons are strict, so landing exactly on a
  threshold is on time — the DAO neither pays a bonus nor levies a penalty for a
  boundary case.
- Early pays cost + bonus, on time pays cost, late pays cost - penalty with no
  bonus. The result floors at zero: a penalty larger than the cost reduces the
  payment to nothing but never makes the contractor owe the DAO and never adds
  back to the balance. Without the floor a large penalty inverts into a credit.
- Conversions use usdToWeiAtRate against the project's stored rate, never the
  live one, so the DAO's exposure stays capped at what it actually minted.
- The balance caps the payout regardless of what the milestone arithmetic says.
- `paid` records the amount, not a boolean, so a zero payout from a heavy penalty
  still settles the milestone and `paid > 0n` blocks a second claim.

Also fixes a bug in dao_project_milestone_terminate from the previous commit: it
released a terminated milestone's escrow at the live rate while the mint had used
the project's fixed rate, so the balance drifted whenever the stability factor
moved. It now releases at the project rate, mirroring exactly what was minted,
and no longer needs the network account at all.
dao_project_change_address, dao_project_end and dao_project_reclaim_balance —
the three transactions that manage a project outside its milestones.

- change_address is committee-only and, per D14, not allowed while the project
  is merely accepted. Before dao_project_start there are no funds to redirect
  and the community voted on a proposal naming that contractor; substituting
  another party then changes what was approved without a vote. It stays open
  after the project ends only while a balance remains, since the contractor can
  still be claiming completed milestones.
- end trims the balance to exactly what completed-but-unclaimed milestones are
  still owed, rather than zeroing it, because the contractor keeps claiming
  after the project ends. Terminated and already-paid milestones release.
- end takes the last milestone's status (D4). Noted at the code: this can
  under-report failure, since a project whose earlier milestone was terminated
  but whose last one completed reads as completed.
- reclaim_balance zeroes what is left after daoProjectReclaimDelayMs (90 days).
  Nothing is transferred — the balance was minted into the project and simply
  ceases to exist, because an unclaimed balance would otherwise inflate the
  supply forever for work that was never paid for.

dao_project_end and dao_project_reclaim_balance carry no fields beyond from and
proposalId, so they reuse schemaDaoProjectStartTX rather than duplicating an
identical shape three times.
- Add dao/projects/:id, which returns the milestones, balance and rate but omits
  the log. dao/proposals/:id already returns the whole account, and for a project
  that is dominated by an unbounded logs array — a caller polling milestone
  progress should not pull the entire audit trail every time. logCount is
  returned so a client knows whether fetching it is worth it.
- Add dao/projects/:id/logs for the trail itself, fetched deliberately.
- Register both after dao/proposals/:id, following the LIFO note already in
  api/index.ts.
- Add client commands for the full lifecycle: dao project <n> and logs, start,
  end, reclaim, address, and the four milestone verbs. The propose-or-endorse
  commands take a blank input to endorse what is pending and a value to propose a
  replacement, mirroring how the transactions themselves distinguish the two.
- Add the three project statuses to VALID_DAO_STATUSES so `dao proposals
  executing` works as a filter. That array is hand-maintained and not derived
  from DaoProposalStatus, so TypeScript cannot catch an omission.
Five fixes from review, three of them real bugs.

- Declare `project` in schemaDaoProposalCreateTX. The schema allowed
  proposalType 'project' but never declared the payload, and
  additionalProperties is false — so enabling AJV validation would have rejected
  every project proposal. Latent today since the flag is off, which is exactly
  why unit tests did not catch it.
- Let the contractor claim after the project ends. loadProjectTxContext required
  'executing', but dao_project_end deliberately trims the balance to what
  completed-but-unclaimed milestones still owe so the contractor can collect it.
  The code contradicted its own design. loadProjectTxContext now takes the
  acceptable statuses, defaulting to 'executing' for everything else.
- Use `paid > 0n` as the settled marker, in the claim handler and in
  dao_project_end's unclaimed calculation. This is sound only while no payout can
  be zero, which the `penalty < cost` creation rule and the start-time wei guard
  establish — both land in later commits, so a zero payout is still reachable
  here and would leave such a milestone claimable forever.
- Clear terminateVotes when a milestone completes. The plan said so and the
  implementation did not: abandoned termination intent could otherwise linger on
  a finished milestone and later reach the threshold, terminating work that was
  already accepted and paid for.
- Let the client create project proposals. The type was in the transaction layer
  but not in the create prompt, so there was no path to submit one. Milestones
  and the contractor address are prompted only for projects, and the change-set
  prompt is skipped for them.
All eight project handlers had the wrong createFailedAppReceiptData contract, so
a failed project transaction cost its sender nothing.

The dispatcher calls it as (tx, txTimestamp, txId, wrappedStates, dapp,
applyResponse, reason) returning void, and the function is responsible for both
deducting the fee and attaching the receipt. These handlers declared
(tx, txId, txTimestamp, reason) returning the receipt, which meant three things
went wrong at once on every failure:

- no fee was deducted, so failing was free and repeatable at no cost
- txTimestamp and txId were transposed, and wrappedStates landed in the reason
  parameter
- the returned receipt was discarded, so no failure receipt was attached at all

Rewritten to match transfer exactly: charge the fee, or the sender's whole
balance when that is smaller, stamp the account, and attach the receipt through
dapp.applyResponseAddReceiptData.

The success paths now go through the same API instead of assigning
applyResponse.appReceiptData and appReceiptDataHash directly. That was
functionally equivalent — the core method only sets those two fields — but every
other handler uses the API, and going direct would silently skip anything core
later adds to it.
- reject penalty >= cost in validateProjectMilestones, naming both amounts
- drop the zero-cost allowance, which the new rule makes unreachable
- keep every late payout strictly positive, so a claim can never settle at zero

A penalty is meant to reduce a payment rather than erase it; a milestone where
lateness forfeits everything is better expressed as a termination. Since
penalty >= 0 was already enforced, penalty < cost implies cost > 0, so the
zero-cost case falls out rather than needing its own check.
- add degenerateMilestoneAtRate, repeating the penalty < cost rule in wei
- call it in dao_project_start before the rate is snapshotted and the mint made
- catch pairs that are valid as USD strings but truncate together at the rate

Creation compares decimal strings, but every payout is a truncating division by
the project's rate, so amounts that differ in USD can land on the same wei
value. The rate is unknown at creation and known at start, and is fixed for the
project's life once snapshotted, so one check here covers every later payout.

A project can now pass creation and still fail to start. That is the intended
outcome: better than minting escrow against milestones that cannot pay out.
- replace the claimed-marker guard with tests for the penalty < cost rule
- assert a zero cost is rejected and a late payout stays strictly positive

The old guard asserted that `paid` could not double as the settled marker.
That premise no longer holds now that a zero payout is unreachable, so the
tests cover the two rules that make it unreachable instead.
- add writeOnceError, applied by the milestone paths before they endorse
- reject a second proposed time, which also enforces the contractor's one call
- read the pending value before writing it, so a first proposal is not mistaken
  for a re-proposal

An endorsement binds to a milestone rather than to a value, so it could be
retargeted: a re-proposal landing between a sender forming an endorsement and it
being processed silently converted an endorsement of one time into an
endorsement of another. Forbidding a second proposal closes that, since what a
sender endorses can no longer change under them. It also enforces the policy's
"the contractor can only call this once", which applyEndorsement's contractor
check did not cover — nothing stopped them re-proposing, and every proposal
resets the count, so they could stall their own milestone indefinitely.

The check sits in the callers rather than in applyEndorsement because the
contractor address path must not have it: proposedAddress is cleared only on a
successful commit, so a first proposal nobody endorses would freeze the
contractor address for the life of the project, and changing that address is the
remedy for a lost or compromised contractor key. Policy line 353 provides for
re-proposal there for that reason. The same race therefore stays open on that
path, bounded by the threshold: a redirected endorsement still leaves two
members who actually chose the committed address.
- drop the status check and allowedStatuses parameter from the loader
- state the status rule in each of the eight handlers, beside its other guards
- return a discriminated union so callers cannot reach the accounts on error
- adopt the loader in start, change address and reclaim, which loaded by hand

The eight project transactions use five different status rules between them, so
a shared default fitted half of them and had to be overridden by the rest. That
default also caused the bug the loader existed to prevent: it silently applied
"executing" to the claim handler and blocked the post-end claim that
dao_project_end trims the balance for, with nothing at the call site showing
which statuses were allowed.

Removing it leaves nothing project-status-specific in the loader, so all eight
handlers can share it rather than five. Behaviour is unchanged — each inline
rule matches the status set its handler had before.
- add findNextPendingMilestone and findExecutingMilestone
- drop milestoneNumber from the start and end transactions, schema and client
- report the derived number in receipts and logs, so neither loses which
  milestone was acted on
- keep milestoneNumber on terminate and claim, which the policy requires

The policy names a different rule per transaction: "start the next milestone"
and "end the current milestone" identify a milestone by state, while terminate
and claim name one explicitly. All four had been flattened into "the sender
supplies a number".

Both derivations are pure functions of wrappedStates, so every node resolves the
same milestone. A start can still retarget if its milestone finishes between the
sender forming the transaction and it being processed, but canStartMilestone
then rejects the new target because its predecessor is not finished; C5's
write-once rule closes the matching hole on the value being endorsed.
- replace the formatted params string with a typed key-value object
- type txType as DaoProjectTxType rather than a bare string
- record what identifies an action, not what resulted from it
- render the object as key=value pairs in the client

The trail exists for disputes between the contractor and the DAO, so a reader
should be able to query it rather than parse a sentence. Amounts minted, paid,
owed and reclaimed are dropped: they are products of the handler and already
recoverable from the account state and the transaction receipt. Keeping them out
also means no value in params is ever a bigint.

Milestone start and end still record their milestone number even though C3
derives it, since an entry that cannot say which milestone was acted on is not
much of an audit entry.
- log the address a sender backed, resolving it from the pending value when the transaction omits it
- reject rather than guess when more than one milestone is executing
- move the audit-trail doc comment back onto DaoProjectLogEntry

A blank endorsement is legal on the address path, so logging tx.proposedAddress directly recorded undefined — off-type for the params record, dropped entirely on serialisation, and it left the trail unable to say which address a member endorsed. That is the one fact a dispute turns on, so it is resolved from the pending value and captured before a commit clears it.

findExecutingMilestone returned the first match. Two executing milestones should be unreachable while canStartMilestone holds, but "the current milestone" has to mean one milestone, and silently ending the earliest of several would write a payout against the wrong one.
- milestonePayoutWei takes the project instead of two percentages and a converter
- read the rate, bonus and penalty percentages from it directly
- note on projectMintAmountWei why the mint still injects its converter

All three call sites passed the same four arguments, every one of them derived
from the project, and the injected converter bought nothing here: usdToWeiAtRate
lives in the same module. What it did buy was the chance to pass a converter
bound to the live rate rather than the rate snapshotted at mint — the bug that
shipped in dao_project_milestone_terminate and was caught by audit rather than
by a test. Taking the project makes it unexpressible.

dao_project_milestone_terminate keeps calling usdToWeiAtRate directly. It
releases escrow rather than paying out — cost plus bonus at the stored rate,
mirroring what the mint put in — so it never goes through milestonePayoutWei,
which would wrongly apply delivery speed to a release.
- add planMilestoneTimeEndorsement and planAddressEndorsement
- each reads the pending value and endorsement list itself, and returns the
  next state instead of mutating
- validate and apply call the same function, so they cannot disagree
- keep applyEndorsement and writeOnceError for their own unit tests

validate dry-ran the endorsement against a copy while apply ran it for real, so
the same six positional arguments were written twice per handler and had to
agree. They diverged once already: apply read "is a value pending" after writing
proposedTime, so every opening proposal looked like a re-proposal, the error was
discarded, and no endorsement was ever seeded.

Nothing below the E2E could catch it. applyEndorsement takes that flag as a
parameter, so its tests passed throughout and would pass again. Reading the
state inside the helper and applying only what it returns removes the caller's
opportunity to mutate first, and the new tests target the function the handlers
actually call.

Two helpers rather than one: the paths differ in value type, in whether the
contractor may take part, and in whether write-once applies. A single helper
would take all of that as flags, which is the indirection this removes.
- require both timestamps and endTime >= startTime before computing a payout
- say when the milestone order check fires, not just that it must run
- give every project status rejection the shape the rest of the repo uses

A missing timestamp used to default to zero, which made the duration hugely
negative, classified the milestone as early, and paid cost plus bonus. The least
trustworthy data earned the most generous outcome. It is unreachable today —
dao_project_milestone_end sets endTime and the completed status together — but
the failure mode was backwards.

endTime >= startTime is a separate check rather than an implication of both
being present: the two times are proposed and endorsed independently, and the
end time is only bounded above by the transaction timestamp. Equal times are a
legitimate zero-length milestone; inverted ones are not.

Callers already route this correctly — the claim path turns it into a rejection
in validate and throws in apply, and dao_project_end throws, since a corrupt
milestone there is a broken invariant rather than a user error.

The order check note records what findNextPendingMilestone cannot catch: the
next pending milestone may still sit behind one that is executing. That
rejection is what makes deriving the milestone safe, so it should not be dropped
as redundant.
- cut restatements of what the code plainly does
- keep every invariant a reader cannot recover from the code

The utils sat at 43-51% comment lines against 3-8% in the handlers, with several
docs longer than the function beneath them. What survives is the reasoning that
took a bug to learn: payouts convert at the rate snapshotted at mint and never
the live one, penaltyUsdStr is an amount while durationPenaltyPercentage is the
trigger, paid > 0n is sound only because a zero payout is unreachable,
write-once covers milestone times but not addresses, and why one module injects
its converter while the other takes the project.
Scenario 21 drives a four-milestone project from creation to reclaim, covering
the paths that only exist on a live network.

- Creation negatives: emergency projects, three-option project ballots and
  milestones whose penalty is not smaller than their cost are all rejected.
- dao_project_start is refused before the vote and from a non-committee sender,
  then asserts the mint is sum(cost + bonus) — penalties excluded — converted at
  the project's own stored rate. Checking against project.rateUsdStr rather than
  the live factor also proves the rate was snapshotted at all.
- Milestone ordering is enforced by the derivation itself: start and end no
  longer send a number, so the 1-based boundary checks are asserted on the claim
  path, which still names a milestone.
- Write-once: once a start time is proposed, neither another committee member
  nor the contractor can replace it, and the original survives the attempt.
- Endorsement flow end to end: the contractor proposes, cannot endorse their own
  proposal, two committee endorsements commit it, and the endorsement list is
  cleared so nothing carries into the end question.

The four milestones each exercise a different path, chosen so the two fixes from
review are tested rather than assumed:

- 1 delivered early, claimed while executing: pays cost + bonus, second claim
  rejected.
- 2 terminated by three distinct committee members — one member voting twice is
  rejected — releasing exactly cost + bonus at the project rate, mirroring the
  mint. The contractor then cannot claim it.
- 3 delivered late with a penalty below its cost, paying cost - penalty. The
  test asserts the exact payout, that the balance falls by precisely that much,
  and that a second claim is rejected — `paid > 0n` settles the milestone, which
  is sound now that no payout can be zero.
- 4 completed but left unclaimed until after dao_project_end, so the widened
  claim allowlist is exercised. The project ends with a balance equal to what
  milestone 4 is owed, which is then claimed while the project reads completed.

Both halves of D9 are covered, and their placement is forced by the fixture: the
claim window is 150s from voting end while the project lifecycle runs for
minutes, so the reward claim happens as soon as the project reaches executing —
which is also the exact status the allowlist was missing. A second voter never
claims, leaving a residue that the tail step burns from a completed project.

Money expectations mirror the handler's arithmetic term by term, not just its
net USD, because every conversion truncates. Sums go through usdSumToLibWei,
one amount at a time, since the handlers convert each milestone's cost and bonus
separately. The late payout subtracts two separately converted amounts for the
same reason: floor(cost) - floor(penalty) can be a wei below floor(cost -
penalty), so converting the difference would not match.

Contractor address changes are covered separately, following the policy: a
proposal, a blank endorsement of it, a re-proposal that resets the count, a
duplicate endorsement rejected, and a non-committee sender rejected. It
deliberately stops short of three endorsements, since committing would replace
the contractor and break every later claim.

Also asserts the under-reporting D4 accepts (the project reads completed despite
milestone 2 being terminated) and that reclaim is refused once the balance is
zero.

sequentialOnly: the milestone chain depends on each endorsement having committed
before the next step, and it asserts on balances only this scenario moves.
- drop timestamp: Date.now() from 129 transaction literals
- say on refreshTxTimestamp that it owns the field, and what to do instead
- correct injectLate's reason, which no longer holds

injectAndAssert and injectExpectReject both call refreshTxTimestamp before
signing, so every timestamp in a transaction literal was discarded. Beyond the
noise it read as meaningful, and once was: Scenario 9.1b set a deliberate offset
that was silently reset, and the step passed for the wrong reason until the
discrepancy was chased down.

fundAccount keeps its timestamp — it builds and signs directly rather than going
through either helper, so its value is the one actually used.
- add sc21Tx for the fields every project transaction repeats
- add sc21EndorseMilestoneTime for the propose-then-endorse sequence
- collapse 34 transaction literals and 5 endorsement loops onto them

Each literal restated the network id, the proposal id and the sender's address
around the one or two fields the step was actually about. The endorsement
sequence appeared six times in two shapes, half of them keying the proposer off
an `i === 0` check written out at each call site — the rule that a proposer
counts as endorsement #1 now lives in the helper that applies it.

Two call sites keep their loops. Milestone 1's start interleaves write-once
rejections between the proposal and the endorsements, and termination is a
different mechanism: every submission carries a reason and none proposes a time.
- add sc21EarlyPayout and sc21LatePayout, reading the fixture amounts
- replace five hardcoded expectations with them

The mint expectation already derived from sc21Milestones while every
per-milestone assertion restated the same amounts as literals. Changing a
fixture amount then meant hand-updating the assertion, which is how the late
payout came to convert a pre-subtracted total and drift by a wei.

A stale hardcoded expectation also fails misleadingly: it reads as a product
bug, and the tempting fix is to edit the number, which quietly changes what the
step covers. Each amount is still converted separately, because the handler
converts separately — summing or subtracting in USD first truncates once rather
than once per amount.
- type the extra fields so type, networkId, from, proposalId and timestamp
  cannot be passed

extra was spread after the invariant fields, so a caller could retarget a
transaction at a different proposal or sender without anything saying so.
Spreading it first would have made the override silently ignored instead, which
is no better; typing those keys as never makes the attempt fail to compile.

Verified both directions: the 34 existing call sites still typecheck, and adding
proposalId to one of them errors with "Type 'string' is not assignable to type
'never'".
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant