Skip to content

ci: take configure-pages v6 and deploy-pages v5 - #9

Merged
tannevaled merged 1 commit into
mainfrom
deps/pages-actions
Aug 30, 2026
Merged

ci: take configure-pages v6 and deploy-pages v5#9
tannevaled merged 1 commit into
mainfrom
deps/pages-actions

Conversation

@tannevaled

Copy link
Copy Markdown
Contributor

Supersedes #6 and #7, which were opened against a workflow with no pull_request trigger and so carried no checks at all (total_count: 0 on both head shas).

This is the first change to go through the gate added in #8: the build runs on this PR, and the deploy job is skipped on it. If either action bump breaks the site build, it is caught here rather than after publication.

Renovate proposed both (#6, #7) against a workflow that ran on no pull
request, so neither carried a single check: `total_count: 0` on both head
commits. They are applied here instead, on top of the workflow that now
builds on a pull request, so that a change to the machinery that publishes
the site is proved by the machinery itself before it reaches main.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
@tannevaled
tannevaled merged commit 9ba2746 into main Aug 30, 2026
2 checks passed
@tannevaled
tannevaled deleted the deps/pages-actions branch August 30, 2026 16:06
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant